Skip to Content

Data Centers

Building the future of technology with common sense

Register to Vote

Election Day is just around the corner. If you're not at the table, you're on the menu. Check your voter registration status and make sure you're ready to protect our future.

  • More Resources

    Data Centers By The Numbers

    93% UNION Union contractors performed the work on 93% of major data center projects that reported a contractor award.
    562 CAMPUSES Scheduled to be constructed for Data Centers as of August 2025.
    2,771 BUILDINGS Thousands of miles of pipe, advanced cooling systems, and skilled UA labor go into keeping these facilities online.
    189+ GIGAWATTS Of total power capacity associated with these projects.
    OVER $1.9 TRILLION In total project value for large-scale data center construction.
    280,000–850,000 UA MEMBERS Potentially required on-site if these projects move forward simultaneously.

    Employment Opportunities and Growth

  • A Case Study on UA Local 602

    Growing Our Membership

    Over a 4 year period the data center industry has helped Local 602’s total apprenticeship enrollment increase by over 450 apprentices, exceeding 1,360 apprentices in 2025 and their total membership increase by over 1,600, exceeding 6,500 members.

    That type of growth is incredible for a number of different reasons, but none more important that the number of lives it allows us to touch by introducing and including so many more workers and their families into the way of life that we all enjoy. This growth, in membership and man hours, have helped Local 602 make some incredible benefit improvements to our medical, pension and other fringe benefits.

    Data Center Facts – Understanding The Reality Behind Common Concerns:

    Many common concerns are based on experiences with data centers built 15–20 years ago. Newer data centers are fundamentally different—designed with advanced efficiency standards for electric and water use, modern cooling technologies, and stricter environmental controls that significantly reduce impacts compared to older facilities. As technology continues to evolve, these improvements not only lower environmental impact but also increase reliability and long-term sustainability for the communities where they are built.

    Concern Reality
    NOISE: Will disturb the peace and quiet 55-60 dB at property edge (normal conversation level)— quieter than a lawn mower. Generators only test 15-30 minutes each month.
    AIR QUALITY: Diesel fumes will create pollution SCR technology eliminates 99% of emissions. Generators run rarely. Cleaner than school buses. UA members at work mean highest quality and safety standards on the job.
    PROPERTY VALUES: Will lower nearby home values Tax revenue funds better schools and services, maintaining and boosting values. Studies show neutral to positive impact.
    POWER BILLS: My costs will rise because of data centers Bills rise from fuel costs, inflation, and grid upgrades—not just data centers. Data centers pay high rates offsetting costs.
    SPRAWL: Approve one and they’ll be everywhere Few unicorn sites have the required power, fiber, zoning, and topography. Each project undergoes rigorous independent review. One approval does not equal blanket approval.

    The Bottom Line

    Data centers deliver substantial economic benefits—high-paying jobs, millions in tax revenue, and minimal community impact. Modern facilities are quiet, clean, and secure, strengthening local economies while supporting schools and essential services. This is an incredible opportunity for the UA. We are on the forefront of what is the next industrial revolution, and with the work that we do, with our membership, our contractor partners and our leadership, no one is in a better position than us to make sure this industry, the future of our world is successful for many generations to come.

    Latest News